Eight trades, each priced on its own basis, not a house rate.

A general handyman rate doesn't tell you anything about a kitchen tear-out or a footing pour. Every trade here carries its own price basis, its own typical lead time and its own list of what's included, because a home renovation crew that quotes everything the same way is guessing on at least one of them.

This page is the index. Each trade below links out to its own page with the full scope, the pricing tiers or per-unit basis, and what we won't do without a licensed trade named on the job.

Catalogue index8 trades listedAustin, Texas

How to read this page

Price basis first, lead time second.

Square footage, linear footage, per-room or per-bathroom tiers, flat call-out plus itemized tasks. Whichever basis a trade uses is set by what actually drives the cost on that kind of job, not by what's easiest to advertise.

Every figure below is a typical range built from jobs this crew has actually run. A range is not a quote. The Scope Builder turns your specific size and finish tier into an estimated band; a signed written scope turns that into the number the job runs on.

01

Kitchen Remodels

Full tear-out to finish, cabinet resets and counter templating. This is the trade most people search for as a kitchen remodel Austin project, and it's the one with the longest lead time once cabinets go on order.

Per square foot of kitchen footprint

View trade
02

Bathroom Remodels

Waterproofing membrane under every tile job, no exceptions. Covers the work people call a bathroom remodel cost Austin TX project, from a fixture swap to a full gut.

Per bathroom, in scope tiers

View trade
03

Flooring

LVP, engineered hardwood, and refinishing of existing hardwood. Flooring installation Austin jobs run on square footage installed, with refinishing priced separately from new material.

Per square foot installed

View trade
04

Drywall & Painting

Patch-to-match texture with a two-coat paint minimum. Drywall repair Austin calls range from one wall patch to a full room reskin.

Per room

View trade
05

Carpentry & Trim

Base, casing, crown and built-ins cut on site. Carpentry trim install Austin work is priced by the linear foot and by profile, not a flat room rate.

Per linear foot

View trade
06

Additions & Framing

Engineered stamped plans required before any wall comes down. A residential framing contractor Austin job of this kind never starts on a sketch alone.

Per square foot of new or altered structure

View trade
07

Decks & Fences

Pressure-treated frame, composite or cedar decking, footings poured to local frost depth. Covers deck builder Austin TX and composite deck cost Austin questions in one trade.

Per square foot for decks, per linear foot for fencing

View trade
08

Repairs & Punch-List

Half-day minimum call-out, itemized list, not hourly guesswork. The usual handyman punch list Austin call: a door that sticks, three patched holes, a fence gate rehung.

Flat call-out plus itemized tasks

View trade

Price basis and typical lead time, side by side.

Comparison of price basis and typical lead time across all eight trades
TradePrice basisTypical lead timeLicensed trade may be named
Kitchen RemodelsPer sq ft of kitchen footprint12–18 working days once cabinets shipElectrician for panel or circuit work
Bathroom RemodelsPer bathroom, in scope tiers7–15 working days depending on tierPlumber for supply line relocation
FlooringPer sq ft installed2–8 working days by room countNone typical
Drywall & PaintingPer room2–5 working days per roomNone typical
Carpentry & TrimPer linear foot1–6 working days by linear footageNone typical
Additions & FramingPer sq ft of new or altered structure4–10 weeks including permit reviewElectrician and plumber for rough-in tie-ins
Decks & FencesPer sq ft (deck) / per linear ft (fence)4–10 working days by footing countNone typical
Repairs & Punch-ListFlat call-out plus itemized tasksHalf day to 3 working daysElectrician or plumber if the item is theirs

Lead times start once a scope is signed and any material is on order, not from the day you call. Additions run longest because a stamped engineered plan and permit review sit ahead of the first stud.

How the number gets set

Same three steps, whichever trade you pick.

01

Walk the job, measure it

Square footage, linear footage, room count or task count, whichever basis that trade actually uses. Guessing at a footprint is how estimates go sideways later.

02

Apply the trade's basis and your finish tier

Standard, upgraded or high-end changes the material and labor multiplier, not the basis itself. A composite deck and a pressure-treated deck are priced on the same per-square-foot basis with a different material line.

03

Write the scope, list what's excluded

Panel changes, gas lines and structural work without an engineered plan get named and routed to a licensed trade rather than folded into our number.

Run your own numbers before you call.

The Scope Builder applies these same price bases to your size and finish tier and hands back an estimated band, a lead-time range and a pre-filled inquiry.