Flooring
Per square foot installed
A kitchen tear-out is the usual point to run new flooring through into an adjoining room.
View the tradeKitchen Remodels
Full tear-out to finish: cabinets, counters, backsplash, the flooring transition and paint. This is the trade behind most kitchen remodel Austin calls we get, and it's priced per square foot of the kitchen's footprint, not a flat number that hides what a bigger room actually costs.
A kitchen remodel Austin quote from us covers everything below unless the scope says otherwise in writing.
Cabinets don't get ordered until the walk-through measurements are confirmed on site, because a showroom estimate off a rough sketch is how kitchens end up with a half-inch gap at the wall.
Once cabinets are on order, the twelve-to-eighteen-day clock starts. Nothing about that number moves faster because a showroom quotes a shorter build time on the boxes themselves; installation, templating and finish work still take the days they take.
Kitchen footprint, appliance locations and any wall the client wants gone get measured and photographed before a single cabinet is priced.
Old cabinets, counters and backsplash come out. Subfloor gets checked here, before it's covered by anything new.
Cabinets go on order against confirmed measurements. Any new circuit or gas line move gets scheduled with the named licensed trade during this window, not after cabinets arrive.
Boxes go in and get leveled first. Counters get templated off the installed cabinets, not off the original drawing.
Backsplash, paint touch-up, hardware and a punch walk against the written scope close the job.
| Cabinet source | Typical order lead time | Note |
|---|---|---|
| In-stock big-box line | 1–2 weeks | Fewest finish and size options |
| Semi-custom showroom line | 4–6 weeks | Most common choice on our jobs |
| Full custom shop-built | 8–12 weeks | Runs on the cabinet shop's schedule, not ours |
The 12–18 working day install window starts once cabinets physically arrive, separate from the order lead time above. A custom cabinet order can push total project time well past the install window; we build that into the written scope's timeline, not into the per-square-foot price.
Before you call
If your question isn't here, the fastest answer is a walk-through, not a guess over the phone.
By the square foot of the kitchen's footprint, then adjusted for finish tier and anything structural or licensed-trade the tear-out turns up. The written scope carries the final basis, and the Scope Builder gives you an estimated band before that conversation starts.
Twelve to eighteen working days once cabinets are on order, not from the day you call us. A showroom promising a faster cabinet turnaround doesn't change the install and finish time on our end.
We run the framing, cabinet and finish work. New circuits, a panel change, or moving a gas line for a range go to a licensed electrician or plumber, named on the estimate rather than buried in our line item.
Work on that wall stops until there's a stamped engineered plan. We don't remove a load-bearing wall on a guess, and we won't quote one as if it were a standard partition wall.
Tell us the footprint and what you want changed. We'll walk it, measure it, and hand back a written scope with the price basis attached.
A message, not a booking.
This is Ronevexa. Tell us what the job is and where, and we'll get back to you.